GD&T / FAI / PPAP CONTROL STACK

GD&T, FAI and PPAP Documentation Built Into Every CNC Release.

Fanuc Cnc supports tooling, equipment and machinery buyers with controller-aware machining records, inspection-ready files and release notes that survive supplier quality review.

CNC control inspection workstation
[01]

CNC Control Parts

Controller panels, drive modules, spindle-side items and configured replacement kits tied to machine serial context.

Review catalog ->
[02]

Tooling Packages

Tool holders, carbide inserts, fixtures and offset documentation released as a controlled manufacturing package.

Build package ->
[03]

FAI Evidence

Ballooned drawings, AS9102 forms, CMM exports and material certificates aligned before first-article shipment.

See FAI path ->
[04]

PPAP Release

Dimensional results, control plans, capability summaries and corrective-action logs prepared for PPAP review.

Map PPAP file ->
[05]

Retrofit Records

Machine upgrade notes, spare-part alternates and validation checkpoints for controlled modernization projects.

Submit machine file ->
2.7M+QMS recordsmachining events archived
6,388+RFQ linescontroller-linked requests
23 yrsdisciplineCNC documentation practice
27checkpointsinspection release gates
2pathsprototype or production release

Operational indicators are maintained in internal QMS records, trailing 12-month or current program basis unless otherwise noted.

CONTROLLED ENGINEERING

Every quote moves through evidence, not guesswork.

Ballooned GD&T drawing review

Print interpretation before cycle planning

Critical characteristics are tagged by datum structure, tolerance type and inspection method before tooling or controller parameters are released.

CNC controller parameter verification

Controller context stays attached

Fanuc-series notes, ladder constraints, offset strategy and spare-part alternates are preserved so purchasing, maintenance and quality teams see the same record.

First article inspection document packet

FAI and PPAP are planned at RFQ

The documentation burden is quoted with the part, including sample size, capability targets, submission level and the evidence required by downstream auditors.

RELEASE TABLE

Documentation options by manufacturing intent.

Drawing reviewDatum scheme, tolerance risk and material condition notes captured before quote release.
InspectionTargeted dimensional report on critical-to-function features.
Delivery fileSetup notes, material certificate and deviation log when applicable.
Control planIn-process checks, sampling frequency and reaction plan documented for repeat orders.
CapabilityCpk targets assigned to selected dimensions after process stability is demonstrated.
TraceabilityLot, revision, operator and machine context retained in QMS records.
FAIAS9102-style balloon map, dimensional results and material evidence.
PPAPSubmission-level matrix, control plan, dimensional report and corrective-action log.
ReviewOpen issues tracked by responsible owner and due date.
AUDIT LANGUAGE

Certifications and files named in buyer terminology.

ISO 9001:2015QMS traceability, revision control and corrective-action discipline.
AS9100DAerospace supplier quality expectations and first-article evidence.
IATF 16949Automotive control plans, PPAP support and serial production risk control.
ISO 13485:2016Medical-device manufacturing records where required by project scope.
VERTICAL FIT

Industries We Serve

From controller-supported machine builds to documented tooling releases, the same evidence framework adapts to regulated and high-mix machinery programs.

DOCUMENT FIRST

Put the print, controller notes and inspection expectations in one RFQ packet.

Fanuc Cnc will return a manufacturing path with risk notes, evidence options and release assumptions clearly separated.